User Tools

Site Tools


cc18:assignment_2

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
cc18:assignment_2 [2018/01/31 11:44]
hossein
cc18:assignment_2 [2018/02/01 19:10] (current)
hossein [Deadline and Deliverables]
Line 81: Line 81:
   /​usr/​local/​pub/​hh/​cc/​   /​usr/​local/​pub/​hh/​cc/​
  
-You can e.g. run this compiler as the following to check the validity of your benchmarks for the first phase+You can e.g. run this compiler as the following to check the validity of your benchmarks for the first task
 If you found a behavior from the reference compiler that you think does not match the description of [[cc17:​eminijava|Extended MiniJava (eMiniJava)]] please feel free to send Bhavin an email. If you found a behavior from the reference compiler that you think does not match the description of [[cc17:​eminijava|Extended MiniJava (eMiniJava)]] please feel free to send Bhavin an email.
   ​   ​
Line 88: Line 88:
 ==== Deadline and Deliverables ==== ==== Deadline and Deliverables ====
  
-The deadline of this project is February ​14th at 11:59pm (https://​mycourses.rit.edu).+The deadline of this project is February ​13th at 11:59pm (https://​mycourses.rit.edu).
 Please upload all your files as a single zip file. Please upload all your files as a single zip file.
 You should include a readme.txt file in your package to report the following items (not including readme can significantly reduce your grade): You should include a readme.txt file in your package to report the following items (not including readme can significantly reduce your grade):
cc18/assignment_2.1517417096.txt.gz ยท Last modified: 2018/01/31 11:44 by hossein